SL No | Project Name | Fuel | Capacity (MW) | Expected COD | Present Status |
01 | Bangladesh – Singapore 700 MW USC CBPP (Phase-1) | Coal | 700 | 2025 |
• MoU has been signed with Sembcorp Utilities Pte. Ltd., Singapore. • Land Acquisition Completed. • Feasibility Study Completed. • ESIA Study On-going. • Owner’s Engineer appointed. • EPC Selection On-going. |
02 | CPGCBL-Mitsui 500-630 MW LNG Based CCPP | LNG | 500-630 | 2023 |
• MoU has been signed with Mitsui & Co., Ltd, Japan. • Land Acquisition Completed. • FS and ESIA Consultant selection On-going. |
03 | CPGCBL-Sumitomo 2x600-660 MW USC CFPP | Coal | 1200-1320 | 2026 |
• MoU has been signed with Sumitomo Corporation, Japan. • Land Acquisition On-going. • FS and ESIA Consultant selection On-going. |
04 | Matarbari 2x600 MW USC CFPP (Phase-2) | Coal | 1200 | 2028 | Phase-2 Ongoing |
05 | Bangladesh – Singapore 700 MW USC CFPP (Phase-2) | Fuel | 700 | 2030 | Phase-2 Ongoing |
Total | 4300 |